HOW TO INSTALL

  • RECIEVE YOUR PARCEL…. OMG YAY!!
  • OPEN UP + CHECK YOU HAVE THESE PARTS…
  • NEON LIGHT – MOUNTING KIT – REMOTE CONTROL / DIMMER –  POWER PACK/ADAPTER.
  • JOIN YOUR NEON CORD TO THE POWER ADAPTER AND CHECK IT WORKS
  • IF YOU WANT THE REMOTE/DIMMER ON THE LIGHT, UNDO PACK AND POP THE SMALL CORD BETWEEN THE ADAPTER + THE CORD (YOU WILL SEE WHERE IT GOES – JUST LOOK AT THE ENDS)
  • DECIDE WHERE YOURE GOING TO HANG YOUR LEGENDARY PIECE
  • MARK ON THE WALL WITH A PENCIL USING THE PRE-DRILLED HOLES WHERE YOU WILL SECURE
  • FIX THE MOUNTING HARWARE INCLUDED TO THE WALL WHERE YOU HAVE MARKED
  • LINE UP THE SIGN ON THE MOUNTING HARDWAR + SCREW THE CAPS THROUGH THE MOUNTING HOLES TO SECURE YOUR SIGN
  • VOILA, YOUVE JUST HUNG YOUR EPIC PIECE

TROUBLESHOOTING

  • UNPLUG ALL CONNECETIONS TO THE SIGN AND WALL AND RECONNECT.
  • REMOVE THE SMALL REMOTE CORD AND TRY PLUGGING IN WITHOUT IT
  • IF YOURE USING AN EXTENTION LEAD OR POWER BOARD TRY PLUGGING DIRECTLY INTO SOCKET.
  • TRY THE NEON IN A DIFFERENT POWER OUTLET
  • ENSURE THE POWER ADAPTER HAS A SOLID GREEN LIGHT ON IT WHEN PLUGGED IN
  • IF THE LIGHT IS OFF, FLASHING OR RED ETC, PLEASE CONTACT US FOR FURTHER INSTRUCTIONS
  • IF YOUR NEON IS STILL NOT WORKING AFTER TRYING ALL OF THE ABOVE, PLEASE EMAIL US WITH IMAGES AND DETAILS